As the construction industry continues to operate through COVID-19 restrictions, our Capital Works program continues full steam ahead. In our overall timeline, we are currently at the Detailed Design phase, which is due for completion by the end of next week. Detailed Design gets to a much more specific level of detail, including discussions around colours, materials, outdoor landscaping as well as the long-awaited cost planner.
We have had two meetings with Content Studio’s landscape architect (Simon) and have discussed the importance of our mature trees, indigenous planting, a natural landscape that mirrors our existing yard (large river stones instead of concrete blocks) and the desire for natural shade options. The placement of priority on these areas has caused small adjustments to the STELLA building plan, such as a repositioning of the stairs, but the group is pleased about this, as it saves the mature She oak that is situated on the south-west corner of the metal playground and also removes a potential bottle-neck that had been identified.
We are pleased to have a number of documents to share with the school community, which can be found on our school website. The new documents include:
200407 BNWPS_DD Meeting Drawings.pdf
200407 BNWPS Design Development_Materials.pdf
200401 Plant palette Brunswick NWPRELIM.pdf
200407 280 BRUNSWICK NW PRELIM DD01-05.pdf